We decided back in December to do a long needed project and remodel our kitchen so here are some pictures to document our journey:
BEFORE
taken 1/19/13
we took these pictures when it was super messy to make the effect more dramatic ;) |
DURING
moving light switches and patching walls |
new vinyl floor 3/2/13 |
We bought our flooring from Cash & Carry Floors in Logan. They had a great selection and a list of installers for us to contact. We saved about $200 on the floor by going there.
Our temporary kitchen. It hardly looks worse than the old one! |
New cabinets delivered 3/4/13 |
We ordered our cabinets from Home Depot and had them install them. Temina at our Logan Home Depot helped us with the design. She is fabulous! She really knows what works and what doesn't and what people usually like and what problems people have so we came up with what would work for our family.
Day 1 of cabinet installation 3/6/13 |
The Home Depot people did a great job installing our cabinets but it cost a fortune! If we were doing this again we would find a private contractor to install for us. I'm sure we cold find someone to do it for less!
Day 2 of cabinet installation 3/7/13 |
We are so excited to have a new kitchen with more space! More pictures to come as it gets finished :)